拱形骨架護(hù)坡的8個(gè)施工步驟
來(lái)源:http://www.linksources.com.cn/ 時(shí)間:2023-03-24 瀏覽量:0
路基坡面防護(hù)是防止土質(zhì)或風(fēng)化巖石的沖刷或剝落采取的措施,起到保護(hù)邊坡的整體穩(wěn)定性,同時(shí)還可以美化路基和協(xié)調(diào)自然環(huán)境。路基坡面防護(hù)采用比較多的一種是拱形骨架防護(hù),其施工過(guò)程主要分為以下8個(gè)步驟。
Subgrade slope protection is a measure taken to prevent erosion or peeling of soil or weathered rock, which protects the overall stability of the slope, beautifies the subgrade, and coordinates the natural environment. The arch skeleton protection is widely used for subgrade slope protection, and its construction process is mainly divided into the following 8 steps.
1、平整邊坡
1. Leveling slope
采用人工對(duì)交驗(yàn)后的坡面進(jìn)行修正、整平,清楚坡面危石、松土、填補(bǔ)坑凹等,要求坡面平整、密實(shí),線形平順。
Manually correct and level the slope surface after inspection, clear the dangerous rocks, loosen soil, and fill the pits on the slope surface. The slope surface is required to be flat, dense, and linear.
2、測(cè)量放樣
2. Survey and setting out
測(cè)量放線前,工程部測(cè)量人員要根據(jù)涵洞位置并考慮混凝土踏步位置整體布拱,在所有拱圈位置確定后才能根據(jù)里程位置精確放線。
Before surveying and setting out, the surveying personnel of the Engineering Department should arrange the arch as a whole based on the culvert position and considering the concrete step position. Only after the positions of all the arch rings are determined can they accurately set out based on the mileage position.
根據(jù)測(cè)放的里程樁現(xiàn)場(chǎng)排出骨架位置,撒白灰線標(biāo)示,排出骨架位置后,要對(duì)相鄰的里程樁再次進(jìn)行閉合測(cè)量。確認(rèn)無(wú)誤后方可進(jìn)行基槽開(kāi)挖。
According to the measured mileage stake, the skeleton position shall be discharged on site and marked with a white gray line. After the skeleton position is discharged, the adjacent mileage stake shall be closed for measurement again. Foundation trench excavation can only be carried out after confirmation.
3、骨架基槽開(kāi)挖
3. Excavation of skeleton foundation trench
根據(jù)施工控制樁拉線,定出拱架的輪廓,拱形骨架用石灰劃出,準(zhǔn)備開(kāi)挖拱架溝槽。采用人工或小型挖機(jī)開(kāi)挖溝槽,根據(jù)設(shè)計(jì)控制線進(jìn)行開(kāi)挖,線形平順,槽底平整、密實(shí)無(wú)松散,尺寸、高程、坡度等檢測(cè)指標(biāo)要滿(mǎn)足設(shè)計(jì)及規(guī)范要求。
According to the construction control pile, the outline of the arch frame is determined, and the arch skeleton is drawn with lime to prepare for excavation of the arch frame trench. Manual or small excavator shall be used to excavate the trench, and the excavation shall be carried out according to the design control line. The alignment shall be smooth, the trench bottom shall be flat, dense, and free of looseness. The inspection indicators such as size, elevation, and slope shall meet the design and specification requirements.
4、砂墊層鋪設(shè)
4. Sand cushion laying
在基槽開(kāi)挖完成后,消除基地松散結(jié)構(gòu),并進(jìn)行灑水,在基地平整、密實(shí)后即可進(jìn)行砂墊層的鋪設(shè)。砂墊層鋪設(shè)使用土工布鋪底,并且防止其他雜物污染砂漿,不得直接倒在土基上使用,厚度為10cm,鋪設(shè)平整、密實(shí)。
After the foundation trench excavation is completed, remove the loose structure of the base and sprinkle water. After the base is leveled and compacted, the sand cushion can be paved. The sand cushion shall be paved with geotextile, and other debris shall be prevented from polluting the mortar. It shall not be directly poured onto the soil foundation for use. The thickness shall be 10cm, and the paving shall be smooth and dense.
拱形骨架
5、拱圈預(yù)制塊鋪設(shè)
5. Laying of arch ring precast blocks
預(yù)制塊自下而上進(jìn)行鋪設(shè),在砂漿墊層上安裝預(yù)制塊。施工時(shí)必須掛線砌筑,保證線性平順、砌體平整,與坡面緊密結(jié)合。
Prefabricated blocks shall be laid from bottom to top, and prefabricated blocks shall be installed on the mortar cushion. During construction, it is necessary to hang lines for masonry to ensure linear smoothness, smooth masonry, and close integration with the slope surface.
為有效的讓上下左右砌筑塊體材料之間的連接更為牢固,砌筑過(guò)程中及時(shí)勾縫,勾縫采用同標(biāo)號(hào)水泥砂漿,縫寬1cm,做成“凹縫”,縫寬要求均勻、直順。
In order to effectively ensure a stronger connection between the upper, lower, left, and right masonry block materials, timely pointing is required during the masonry process. The pointing is made using cement mortar of the same grade, with a joint width of 1cm, and is made into a "concave joint". The joint width is required to be uniform and straight.
拱圈施工時(shí),邊坡急流槽和檢查踏步一并配合施工需,將急流槽和檢查踏步設(shè)置于拱間處以利于排水。
During the construction of the arch ring, the slope chute and inspection steps shall be arranged together to meet the construction requirements. The chute and inspection steps shall be arranged between the arches to facilitate drainage.
6、設(shè)置伸縮縫
6. Setting expansion joints
沿路線縱向每隔3~4個(gè)拱圈設(shè)伸縮縫一道,伸縮縫設(shè)置在拱頂預(yù)制塊附近,鋪砌預(yù)制塊時(shí)用木板隔開(kāi),施工完成后用浸瀝青麻絮填塞密實(shí),填塞深度不小于10cm。
Along the longitudinal direction of the route, an expansion joint is set every 3 to 4 arch rings. The expansion joint is set near the precast block on the arch crown. When paving the precast block, it is separated by wooden boards. After the construction is completed, it is densely filled with asphalt oakum, and the filling depth is not less than 10cm.
7、骨架養(yǎng)生
7. Skeleton curing
完成的拱形骨架護(hù)坡及時(shí)養(yǎng)生,進(jìn)行覆蓋灑水,保持現(xiàn)澆砼、勾縫砂漿濕潤(rùn)。
The completed arch skeleton slope protection shall be timely cured, covered and watered, and the cast-in-situ concrete and pointing mortar shall be kept moist.
8、拱架內(nèi)植草綠化
8. Grass planting and greening within the arch frame
拱形骨架預(yù)制塊鋪砌完成,待拱架具有一定強(qiáng)度后,進(jìn)行客土回填,并對(duì)土進(jìn)行夯實(shí),注意培土頂面低于骨架3~5cm,之后在骨架內(nèi)三維網(wǎng)植草綠化,采用人工撒播的方式,撒播草種后在坡體表面撒5cm厚細(xì)粒客土并灑水濕潤(rùn)避免草種受雨水沖失或烈日暴曬。
After the paving of the prefabricated blocks of the arch skeleton is completed, and after the arch skeleton has reached a certain strength, carry out the backfilling of the guest soil, and tamp the soil. Note that the top surface of the soil is 3~5cm lower than the skeleton. Then, plant grass in the three-dimensional mesh within the skeleton for greening, using manual sowing methods. After sowing the grass seeds, sprinkle 5cm thick fine grained guest soil on the slope surface and sprinkle water to prevent the grass seeds from being washed away by rain or exposed to the scorching sun.
拱形骨架護(hù)坡的8個(gè)施工步驟相關(guān)內(nèi)容就講解到這里了。您對(duì)此有怎樣的疑惑或者問(wèn)題,就來(lái)我們網(wǎng)站http://www.linksources.com.cn咨詢(xún)!
The relevant content of the 8 construction steps of arch skeleton slope protection will be explained here. If you have any doubts or questions about this, please come to our website http://www.linksources.com.cn consulting service
相關(guān)產(chǎn)品
相關(guān)新聞

聯(lián)系人:鞏經(jīng)理 手機(jī):13905418708/18254189888
辦公室地址:濟(jì)南章丘區(qū)刁鎮(zhèn)瑞祥路5號(hào)
廠區(qū)地址:濟(jì)南章丘區(qū)棗園街道吉祥村工業(yè)園
備案號(hào):魯ICP備2023005268號(hào)-1 網(wǎng)站地圖    TXT    XML

主站蜘蛛池模板: 亚洲福利一区 | 狠狠色婷婷丁香六月 | 久草在线观看首页 | 亚洲综合久久1区2区3区 | 国产毛片久久精品 | 羞羞视频网站在线看 | 2021国产精品自产拍在线 | 在线观看视频色 | 欧洲视频在线观看 | 国产亚洲综合成人91精品 | 四虎网址 | 亚洲欧美激情视频 | 黑色丝袜美女自安慰视频 | 色老头永久免费视频 | 中文在线观看免费视频 | 亚洲欧美激情视频 | 久草在线新免久费观看视频 | 精品免费久久久久久成人影院 | 成人国产在线观看 | 欧美极品在线观看 | 久草热线视频 | 日本黄色小视频在线观看 | 天堂网色 | 午夜精品在线视频 | 午夜小电影 | 天天操天天射天天插 | 免费香蕉视频 | 欧美一级网址 | 免费黄色的视频 | 欧美一级片在线看 | 九九热在线精品视频 | 啪啪免费网站入口链接 | 日韩欧美二区 | 日韩免费视频 | 亚洲电影一区二区三区 | 泰国一级毛片aaa下面毛多 | 高清一区二区 | 欧美日本国产VA高清CABAL | 668溜溜吧| 日韩高清一区二区 | 婷婷色九月综合激情丁香 |